The Grand Theater was completed on September 22, 2017. The structure of the project is a frame shear wall structure with a total construction area of 68,019 square meters. The Grand Theater has a construction area of 15,162 square meters, with more than 1,090 seats, 550 of which have voting machines. The small theater has a construction area of 4,968.54 square meters. The fire resistance level of the project building is Class I, the construction project category is Class I building, the roof waterproofing level is Class I, and the building seismic fortification category is Class C (seven degrees fortification).